- Transport and highways: Harefield doesn't benefit from a good public transport network. The development would render future occupants of flats of the site (131 flats in total) heavily reliant on the private cars and this does not present a sustainable form of development.
- Lack of information regarding bin collection
- Noise Impact Assessment: Lack of noise report and Impacts of noise from commercial premises on the intended occupiers of the development
- Fire: The applicant/ agent has not included provision for a satisfactory turning space within the site for Fire Engine at 8.5mL along with a 3.7mW access from the highway for emergency vehicles
- Conservation Area: The application sites are located within
the Widewater Lock Conservation Area. And therefore, the impact of
the change of use of the ground floor and first floor of the
buildings on the character or sustainability of the conservation
area must be considered which the applicant/ agent hasn't provided
this assessment in full.
This ePetition runs from 18/06/2024 to 19/07/2024.
36 people have signed this ePetition.